
Explore our operations, media, and story.
Navigate the Site
Use the sections on the left to jump directly to videos, photos, documents, site history, strategy, sustainability, and records.
Our history, strategy, and operational philosophy
Phase 1 ROM, Phase 2 Concentrate, Phase 3 Copper Products
Kaydav Investments and nine years of operational knowledge
Compliance, competitive position, and looking ahead
Drone footage, blasting, plant operations, and more
Production records, assay results, site galleries
A comprehensive visual record of site activities, processing equipment, mineralised ore, and infrastructure.




A comprehensive look at the history, operations, and strategic evolution of the Silverside copper mining claim — from run-of-mine ore to high-value refined copper products.
Strategic evolution from ROM to concentrate to higher-value copper products.↑ Back to Menu

The Silverside operation has undergone a deliberate and phased evolution since its establishment — each stage building on the last, and each transition informed by a clear reading of market dynamics and regulatory trends. The business has progressed from selling raw run-of-mine ore, to producing high-grade copper concentrate, and is now positioning to deliver refined, higher-value copper products. This trajectory reflects a consistent philosophy of adding value at each stage of the supply chain while maintaining operational flexibility.
Run-of-mine ore sold directly to smelters and customers in South Africa.
On-site processing to produce 25–32% copper concentrate for export.
Leaching to produce copper sulphide, cement, and ~90% copper blister.
In the earliest phase of operations, the mine produced run-of-mine (ROM) ore, which was sold directly to smelters and processing customers, primarily in South Africa.
This initial phase allowed Tom and the Silverside team to develop a deep understanding of the ore body's characteristics, establish reliable haul and logistics routines, and generate early-stage revenue while the operational foundation of the mine was being built. The knowledge accumulated during this period proved invaluable in designing the subsequent concentrate production facility and in planning for the more technically demanding Phase 3 transition.
The strategic direction for Silverside's next phase centres on a deliberate shift toward higher-value copper products through a leaching-based processing approach. The plan involves partially dismantling the existing concentrate plant — retaining only the crushing and upgrading circuits required to process a small volume of concentrate — and redirecting the operational focus toward leaching low-grade ore.
This leaching programme will produce copper sulphide, copper cement, and copper blister at approximately 90% purity.
These products command materially higher market prices than unrefined concentrate and, critically, qualify for export under the new government regulations that have significantly restricted copper product exports.
The following operational and strategic highlights summarise the Silverside copper mine's current position and competitive standing within the regulated copper export market.
100% owned by Tom Ritchie through Kaydav Investments (Private) Limited — no joint venture, no shared equity.
245 hectares under the Silverside mining claim, held continuously for 9+ years.
One of only 2–3 mines in the country with the ability to export copper products under current government regulations.
Proactive regulatory anticipation — consistently adapting ahead of market and policy changes in gold, chrome, lithium, and now copper.
Tom Ritchie has a demonstrated track record of anticipating regulatory and market shifts before they materialise — in gold, chrome, and lithium — and positioning Silverside to benefit each time. He is now executing the same playbook for copper: moving the operation from concentrate production into higher-value refined copper products, ahead of the market and ahead of competitors.
Phase 1 — Raw ore sold direct to smelters and South African buyers. Minimal capital outlay; volume-driven, low-margin entry point.
Phase 2 — On-site processing delivering 25–32% copper concentrate. Eighteen months of consistent, proven output.
Phase 3 — Leaching of low-grade ore to produce copper sulphide, cement copper, and ~90% copper blister for direct export.
Each phase has been a deliberate step forward — more value extracted, stronger margins, deeper competitive positioning. Phase 3 is not a pivot; it is the logical culmination of a strategy that has been in motion for years.
The economics of moving from concentrate to refined copper products are compelling. Copper sulphide, copper cement, and copper blister command significantly higher prices on international markets than raw concentrate, and the shift to leaching-based production offers the additional advantage of unlocking value from previously uneconomic low-grade ore that would otherwise remain in the waste stream.
Refined copper products — particularly copper blister at ~90% purity — command premium prices relative to concentrate, improving revenue per tonne of ore processed.
Leaching enables the economic processing of low-grade ore that would otherwise be stockpiled or discarded, increasing the effective resource utilisation of the Silverside claim.
New government regulations restrict raw copper exports. Refined products qualify for export under these regulations, giving Silverside a critical and rare commercial advantage over competitors.
The transition to Phase 3 requires a deliberate restructuring of the existing on-site processing plant — reducing operating costs while preserving essential capability for leaching and a parallel concentrate operation.
High-cost concentrate processing equipment is removed to reduce operating overhead.
Investment focus shifts toward leaching infrastructure development for Phase 3.
Crushing, upgrading circuits, and core site infrastructure remain fully operational.
Full extraction operations run uninterrupted throughout the entire transition period.

Ownership & Structure
Kaydav Investments (Private) Limited is wholly owned by Tom Ritchie — a single, clear ownership structure with no joint-venture partners, no shared equity, and no third-party encumbrances on the mining claim. Tom holds the Silverside mining claim outright, covering a total area of 245 hectares of prospective copper-bearing ground.
Tom Ritchie has maintained continuous tenure over the Silverside claim for approximately nine years, accumulating an exceptional depth of operational knowledge about the deposit's geology, mineralogy, and processing behaviour. This long tenure is not merely a matter of record — it represents a genuine competitive advantage in understanding what the ore body is capable of producing and how best to extract value from it over the long term.
The nine-year operational history at Silverside has generated a body of site-specific knowledge that cannot be replicated by a new entrant. From blast design and ore selectivity to plant calibration and concentrate marketing, the Silverside team has navigated the full spectrum of challenges encountered in developing a producing copper mine from a greenfield claim.
Deep familiarity with the Silverside ore body's grade distribution, structural controls, and mineralogical variability, built through nine years of continuous sampling and production data.
Hands-on experience commissioning, operating, and optimising multiple processing configurations — from ROM handling and chrome spirals to the current concentrate plant and the planned leaching circuit.
A proven track record of anticipating and adapting to regulatory changes in gold, chrome, lithium, and now copper exports — consistently positioning Silverside ahead of the curve.
Tom Ritchie's decision to invest in an on-site concentrate plant — ahead of anticipated changes to copper export regulations — has proved to be a strategically astute move. The plant has now been operational for 18 consecutive months, generating a robust and independently verifiable production track record that underpins investor confidence in the mine's capability and future potential.
Consecutive months of concentrate plant operation
Tonnes of copper concentrate produced per month
Copper grade consistently achieved in production
Total area of the Silverside mining claim

The decision to build and operate a concentrate plant was not reactive — it was proactive. Tom Ritchie observed early signals that export requirements for raw copper ore were likely to tighten, drawing on experience from similar regulatory shifts that had affected gold, chrome, and lithium producers. By building processing capability before the regulatory change took effect, Silverside was positioned to continue exporting copper product when competitors without processing infrastructure were constrained.
Processing investment made ahead of export regulation changes — not in response to them. This timing gave Silverside a first-mover advantage in the concentrate export market.
Concentrate production at 25–32% copper grade delivers substantially higher revenue per tonne than raw ROM ore sales, improving the mine's economics at every stage of the ore-to-product pipeline.
The installed plant, operational experience, and production data generated during Phase 2 form the technical and commercial foundation upon which the Phase 3 leaching programme will be built.

New government regulations — specifically those affecting copper, lithium, gold, and chrome exports — have fundamentally reshaped the mining and export landscape. Tom Ritchie has consistently read these regulatory shifts early and adapted Silverside's operations accordingly, staying ahead of compliance requirements while turning regulatory constraints into commercial advantages.
A Rare Competitive Advantage
Silverside is one of only two or three mines in the country that currently owns a copper mine with the physical infrastructure and operational capability to produce and export copper product under the new government regulations. This is a significant and defensible competitive moat — one that positions Kaydav Investments as a preferred and compliant supplier in an increasingly regulated export environment, and that meaningful limits the number of competitors able to access international copper markets.

The transition from concentrate to leached copper products represents the next chapter for Silverside — one built on nearly a decade of operational experience, a proven track record of anticipating regulatory change, and a rare export licence that very few competitors can match. The strategic logic is clear, the infrastructure is largely in place, and the regulatory environment has moved in Silverside's favour.
"I always like to anticipate further changes… I believe this is the right track — but not set in stone, as I always have an open mind."
— Tom Ritchie, Owner, Kaydav Investments (Private) Limited
Uninterrupted extraction throughout the plant transition period — maintaining cash flow and operational momentum.
Deploy leaching infrastructure to unlock economic value from material that was previously uneconomic to process through the concentrate circuit.
Leverage the export licence and regulatory position to supply copper sulphide, cement, and blister to international buyers at premium pricing.
Mining operations, blasting, processing, and production at the Silverside claim.
This aerial drone footage captures the full scale of active open-pit mining operations at Silverside. The 8-hectare pit represents years of systematic extraction, with clearly defined benches, haul roads, and exposed mineralised zones visible across the landscape. The surrounding terrain and proximity to infrastructure underscore the site's operational maturity and logistical accessibility.
This drone perspective reveals the on-site processing infrastructure at Silverside, documenting the scale of investment made across the mine's operational footprint.
This aerial view highlights the exposed pit walls and benched rock faces following sustained blasting and excavation activity. The scale of the pit and the extensive material movement visible in this image are consistent with the mine's documented extraction volumes. Haul roads connecting the pit floor to the processing area are clearly identifiable, demonstrating an efficient operational layout designed to maximise throughput.
Infrared imaging provides a unique thermal perspective of the Silverside pit, revealing heat signatures and rock composition across the exposed face.
Slow-motion infrared footage allows for a more detailed examination of the pit's rock structure and thermal characteristics. At this reduced playback speed, geologists and mining engineers can identify subtle mineralogical contrasts and structural discontinuities that guide ore extraction decisions. This level of site documentation reflects the operational rigour applied at Silverside, where modern survey techniques complement traditional mining methods.
Controlled blasting is a core component of the Silverside mining cycle, used to fracture hard rock and expose mineralised ore for extraction.
When reviewed in slow motion, blast footage provides detailed insight into the rock fracture mechanics and the effectiveness of the charge pattern used. This documentation is a valuable operational tool, enabling blast engineers to evaluate fragmentation outcomes, adjust drill-and-blast parameters, and improve both efficiency and ore recovery rates over time. It also serves as a formal record of blasting activity for regulatory compliance and safety management purposes.
Following each blast cycle, the pit is assessed from the air to evaluate fragmentation quality, bench geometry, and newly exposed mineralised material.
Designed, assembled, and commissioned entirely by Silverside's own staff — no external contractors.
Marked the transition from selling raw ore to producing value-added copper concentrate on-site.
Established the processing expertise that informed every subsequent plant upgrade and improvement.
Feed preparation ahead of the milling and separation circuits ensures consistent particle size and optimal copper recovery.
This image shows the main conveyor feed system and ball mill assembly that form the backbone of the Silverside concentrate plant. The inclined conveyor delivers crushed ore to the mill for grinding, reducing particle size ahead of the downstream separation and concentration circuits. The ball mill, visible in the background, is a critical component in liberating copper minerals from the host rock, enabling effective concentration and grade improvement in subsequent processing steps.
Ground-level documentation provides an auditable record of active processing equipment for investors and stakeholders.
Active processing equipment operated and maintained directly by Silverside's own team — a practical, in-house approach.
In-house capability reduces dependence on external contractors for routine operations and maintenance, protecting margins.
Detailed photographic records of processing equipment form part of Silverside's comprehensive operational documentation. These records support asset management, maintenance scheduling, and future capital planning. The equipment shown reflects the practical, fit-for-purpose approach taken in developing the on-site processing capability — prioritising reliable performance and operational flexibility over capital intensity, consistent with the mine's strategy of retaining financial agility while scaling production.
Efficient ore handling and stockpile management are essential to maintaining consistent feed rates to the processing plant. This image documents the stockpiling and material management practices employed at Silverside, where mined ore is classified, staged, and fed to the plant in a controlled manner. Effective stockpile management helps buffer against blast cycle variability and ensures that the plant operates at or near its design throughput capacity on a consistent basis.
Feed preparation ahead of the milling and separation circuits is a critical step in the concentrate production process. Properly sized and classified feed material ensures consistent mill performance and helps maximise copper recovery across the plant. This image documents feed preparation activities at Silverside, reflecting the operational discipline applied at each stage of the production process to maintain concentrate grade and recovery targets within the 25–32% copper range consistently achieved over the past 18 months.
The breadth of on-site infrastructure at Silverside reflects the scale of investment made over the mine's operational life. From primary crushing and milling through to final concentrate handling, each piece of infrastructure has been selected and commissioned to support the mine's production objectives. This view captures the operational character of the site — a working mine with purpose-built facilities, actively producing saleable copper products and positioned to transition to higher-value output in the next phase of its development.
Multiple processing units working in sequence deliver 90–160 tonnes of copper concentrate per month at Silverside.
Multiple processing units working in sequence are required to achieve the consistent concentrate grades produced at Silverside. This image documents additional plant components that support the classification, separation, and upgrading stages of the concentrate production circuit. The combined throughput of these units has enabled the mine to consistently deliver 90 to 160 tonnes of copper concentrate per month, demonstrating the reliability and productivity of the installed processing infrastructure.
Following each blast, newly exposed rock faces are inspected and sampled to assess copper grade and guide ore sorting decisions.
This image provides a further view of the active concentrate processing circuit at Silverside. The operational condition of the equipment and the organised layout of the processing area reflect the standard of site management maintained throughout the mine's production history. Continuous operation of this circuit over 18 months has generated a meaningful track record of production data, providing investors and stakeholders with a reliable basis for assessing the mine's demonstrated output capability and future production projections.
Following each blast, newly exposed rock faces are inspected and sampled to assess copper grade and guide selective mining decisions. This image shows copper ore at grades of 3% to 7% — a commercially significant grade range for open-pit copper operations. The visible mineralisation confirms the continuity of the copper deposit at depth and supports the geological model underpinning the mine's resource estimate. Selective mining of higher-grade zones maximises the economic value of ore processed through the concentrate plant.
This close-up view of post-blast ore material highlights the visible copper mineralisation present across the Silverside deposit. The presence of characteristic copper mineral colourations — including malachite greens and chalcopyrite — is evident in the fragmented material. This visual evidence of mineralisation, combined with the assay data from systematic sampling programmes, provides a solid foundation for the mine's geological understanding and underpins the confidence with which future production forecasts are made.
A chrome spiral plant was repurposed on-site for copper concentrate production — a demonstration of the team's engineering adaptability.

The culmination of the mining, blasting, crushing, milling, and separation process is a high-grade copper concentrate — a saleable product ready for delivery to smelters and downstream processors. Silverside's concentrate consistently achieves grades of 25% to 32% copper, placing it firmly within the commercially acceptable range for international copper concentrate buyers. This product quality is the direct result of disciplined plant operation, careful ore selection, and continuous process optimisation by the on-site team.
In an early effort to scale up concentrate production, an existing chrome spiral plant on site was repurposed for copper concentration. While this conversion was carried out imperfectly — spiral gravity separation is not ideally suited to copper sulphide minerals — it provided valuable operational learning and demonstrated the team's resourcefulness in utilising available infrastructure. The experience directly informed subsequent decisions to invest in more appropriate processing technology for the copper concentrate circuit.
XRF analysis verifies copper grades in the concentrate, providing rapid on-site quality assurance for each production batch.
The discharge and collection of copper concentrate at the end of the processing circuit is the operational moment when the value of the mining and processing effort is realised. This image captures the concentrate output stage of the Silverside plant, where the upgraded copper product is collected, weighed, and prepared for assay sampling and eventual sale. Consistent concentrate quality at this stage — averaging 25–32% copper — has been the hallmark of the plant's performance over its 18 months of continuous operation.
The slurry and separation circuit separates copper-bearing minerals from gangue material, producing the final saleable concentrate.
The slurry and separation circuit at Silverside is responsible for the critical step of separating copper-bearing minerals from the waste gangue material after milling. Water-based slurry processing allows for effective density and surface chemistry-based separation, producing a copper-enriched concentrate stream for further upgrading. The management of water, reagent dosing, and circuit parameters within this stage of the process requires ongoing attention and technical expertise, both of which are well established within the Silverside operational team.
CA spiral plant in copper processing uses gravity and centrifugal force via spiral chutes or concentrators to upgrade low-grade copper ore. It typically raises run-of-mine feed grades from 1–3% up to marketable 20%+ concentrations, reducing downstream processing size and costs before final refining or flotation
James tables use gravity and water flow to separate copper-bearing minerals by density, providing an effective final concentration step.
This image provides a closer operational view of the James table separation circuit in use at Silverside. The table's riffled deck, water distribution system, and drive mechanism are clearly visible, highlighting the practical application of gravity concentration technology within the mine's processing plant. Proper calibration and maintenance of shaking tables is essential to achieving optimal separation efficiency, and the Silverside team's experience with this equipment has contributed to the consistently high concentrate grades achieved during the plant's operational period.
Copies of daily, weekly, and monthly load reports are attached as supporting documentation. These records form part of Silverside's formal operational archive and provide a transparent and auditable account of material movement since record-keeping commenced. The consistency of haulage activity reflected in these reports is a meaningful indicator of operational continuity and the mine management team's commitment to rigorous production monitoring and reporting standards.

Field-level documentation across all areas of the Silverside operation ensures that a comprehensive visual and written record of mining activities is maintained. This image forms part of the broader site documentation archive, capturing operational activity that complements the formal production records and haulage reports. Together, these materials provide investors with a multi-dimensional picture of the mine's scale, operational maturity, and management capability — building confidence in the site's ability to deliver on its strategic production and commercialisation objectives.

Copper sulphide is the primary mineral of value in the ore body, and consistent assay results across multiple sample intervals provide a strong foundation for resource estimation and production planning.
These results, along with copper cement and blister production data, will be central to demonstrating the economic viability of the planned Phase 3 leaching operation to potential partners, financiers, and offtake buyers.

Formal analytical documentation of copper assay results provides the evidentiary basis for grade reporting at Silverside. Results obtained from the concentrate plant, post-blast sampling, and leaching trials are systematically recorded and form part of the mine's technical data package available to investors and technical reviewers. The quality and consistency of these results across multiple sample batches reinforces confidence in the continuity of the copper mineralisation within the 245-hectare Silverside claim, and supports the forward planning for Phase 3 copper product production.
The following gallery presents a selection of operational photographs from the Silverside claim, documenting site activities, processing equipment, mineralised ore, and infrastructure across the mine's production history.
↓
























The following gallery presents a selection of operational photographs from the Silverside claim, documenting site activities, processing equipment, mineralised ore, and infrastructure across the mine's production history.

























The scale of material movement, infrastructure development, and land use visible in this perspective underscores the significant investment of capital, time, and expertise that has been deployed at this site over the past nine years. It is this foundation that positions Silverside as a credible, production-ready asset capable of transitioning to higher-value copper output.


These operational images document active mining and processing activities at Silverside, providing visual confirmation of the site's ongoing production status and the scale of infrastructure deployed across the claim.
These images, drawn from the full Silverside operational archive, document the breadth of activities undertaken across the claim. From pit-level mining and blasting through to plant operations and product handling, the visual record presented throughout this overview provides a transparent and comprehensive account of the mine's history, current state, and forward trajectory.
Silverside is not a speculative exploration prospect. It is a producing copper mine with nine years of continuous operational history, a documented record of over 2.2 million tonnes of material moved, 18 months of consistent concentrate production at 25–32% copper grade, and a strategic position that is uniquely favoured by the current regulatory environment.
The mine's transition to Phase 3 — leaching-based copper product production — is the logical and well-prepared next step in a deliberate, decade-long value creation journey. With Tom Ritchie's ownership, operational expertise, and proven ability to anticipate and adapt to regulatory change, Kaydav Investments is positioned to deliver meaningful returns from one of the very few copper operations in the country with both the capability and the licence to export refined copper products to international markets.
2.2M+ tonnes moved, 18 months of concentrate output
One of 2–3 mines nationwide able to export copper product
Phased evolution from ROM to concentrate to refined copper
9+ years on-claim, single owner, deep operational expertise
CONTACT US
Company: Kaydav Investments (Private) Limited
Owner: Tom Ritchie
Mine: Silverside Copper Mine, Zimbabwe
Email: [email protected]
Phone: [+263 77 288 1192]
For investment enquiries, site visits, or partnership discussions — we welcome your contact.

Kaydav Investments (Private) Limited